COMPLETED PROJECTS


 
Name of Project: Construction of Coal Berth No.4 (350 x 33m)
Client: Marg Ltd.
Area: Karaikal, Pondicherry
Type:  Berth Construction, Marine Infrastructure project
Status:  Completed
Year:  2012
Price:  575 Million Rupees
Total Rm:  12500
Description:  The job involved the construction of 1200mm dia Bored Cast in Situ Piles varying from 45m to 63m depth. The berth was 350m long and 33m wide including additional berthing area for the first transfer house of conveyor gallery. The precast Beams were erected using End on Gantry Method. Weight of some of the precast hollow sections varied between 30 to 32 MT each. The Berth has been constructed to handle vessels of the size of Panamax carrying coal to the port. The Challenge in the project was the time period in which it was executed.

The project was completed in 16 months.


Name of Project: Construction of RCC Jetty on Bored Pile Foundation
Client: Government of India, Ministry of Shipping, Lakshadweep Harbour Works
Area:  Eastern Minicoy Island, Lakshadweep
Type:  Jetty Construction, Marine Structure
Status:  Completed
Year:  2008
Price:  109 Million
Total Rm:  4000
Description:  The location of the work done is very close to the 10 degree channel. The currents are very high and due to this the swells and waves are generally 4-5m high. The length of the approach was 230m and the approach was constructed on 800mm dia piles. The Berthing face is 130m long supported on 1100mm dia piles. It is a fair weather jetty which is operational only from October to June. Difficulties were faced during construction as in cyclonic conditions the waves come over the berth and lift the precast beams placed and throw them into the sea which lead to these beams being fished out by us to proceed with the work.

The project was completed in 32 months.


Name of Project:  Piling and Foundation Civil Works of Mechanization system
Client:  Marg Ltd.
Area: Karaikal, Pondicherry
Type:  Bored Piles for Ports, Marine Infrastructure project
Status:  Completed
Year:  2011
Price:  142 Million Rupees
Total Rm: 18000
Description:  The job involves construction of Bored Cast in Situ Piles of 600mm dia to 1000mm dia and construction of Pile cap, tie beams for ship unloader, conveyor, station houses, wagon loader, etc. including all the foundation bolts, etc.

The project was completed within 8 Months.


Name of the Project:  Piling work for Power Block unit No.1 and other miscellaneous auxiliary buildings (2x520MW)
Client:  Power Mech Project Ltd.
Area:  HNPCL, Vishakhapatnam
Type:  Bored Piling with rock socketing
Status:  Completed
Year:  2011
Price:  111 Million Rupees
Total Rm:  12000
Description:  The job involves construction of Bored Cast in Situ Piles of 600mm and 750mm dia piles. The depth of the pile was between 22-25m and all the piles were socketed in hard rock. The job was executed for Hinduja Power Project (HPP) where BHEL was the EPC Contractor and our client Power Mech Projects Ltd. (HNPCL, VSP) was awarded the above mentioned job.

The project was completed within 6 Months.


Name of Project:  Construction of OSV Berth and extension works
Client:  Marg Ltd.
Area: Karaikal, Pondicherry
Type:  Berth Construction, Marine Infrastructure
Status:  Completed
Year:  2010
Price:  113 Million Rupees
Total Rm:  5400
Description:  The job involves construction of 230m long and 22m wide Berth for off shore vessels having a draft of up to 12m.
The project was completed within 8 Months.


Name of Project:  Construction of Piles for Haldia 4A berth, Haldia
Client:  Marg Ltd.
Area: Karaikal, Pondicherry
Type:  Berth Construction, Marine Infrastructure
Status:  Completed
Year:  2010
Price:  113 Million Rupees
Total Rm:  5400
Description:  The job involves construction of 230m long and 22m wide Berth for off shore vessels having a draft of up to 12m.
The project was completed within 8 Months.


Name of Project:  Re- Construction of Fisheries Jetty, Port Blair
Client:  Government of India, Ministry of Shipping, Andaman Lakshadweep Harbour Works
Area: Phoenix Bay, Port Blair, Andaman Islands
Value: 22 Million Rupees
Description:  During Tsunami the existing fisheries jetty at Phoenix Bay, Port Blair constructed on pre-cast piles got tilted and fell into the sea. Due to space constraint the government decided to construct a new jetty on Bored piles over the existing collapsed jetty. Hence, 1000mm dia Bored Cast in Situ piles were cat on either side of the collapsed jetty and cast in situ beams of 21m length x 2m depth x 1m width were cast across the jetty over which the deck was laid.
The project was completed within 18 Months.


Name of Project: Re-Construction of Berthing Jetty and Jetty approach a Gandhinagar in North Andaman.
Client: Government of India, Ministry of Shipping, Andaman Harbour Works
Area:  Gandhinagar, North Andaman Islands
Type:  Jetty, Marine Structure
Status:  Completed
Year:  2010
Price:  90 Million Rupees
Description:  Due to the Tsunami the existing jetty constructed on pre-cast piles got disturbed and became unusable. Hence a parallel jetty was constructed by us with solid approach bund of 300m and pile approach of 130m on Bored Cast in Situ piles of 760mm dia with a berthing head of 15m. This Berth is being used to berth small passenger vessels.
The project was completed within 12 Months.